Design-Build vs. Design-Bid-Build: A Comprehensive Guide to Choosing the Best Approach

Design-Build vs. Design-Bid-Build: A Comprehensive Guide to Choosing the Best Approach
Written by
Nick Chatzigeorgakis
Published on
December 14, 2024
Read time
10
min
Category
Design-Build

Design build vs design bid build: If you're navigating the maze of construction project delivery methods, you may find yourself comparing these two popular approaches. Both design-build and design-bid-build offer unique pathways to bring your vision to life, but they cater to different project needs and priorities.

  • Design-Build: This method involves a single entity handling both design and construction, allowing for more collaboration and faster project completion.

  • Design-Bid-Build: It separates the design and construction phases, providing more competitive bidding options but often leading to extended timelines.

Choosing the right method is pivotal—not just for meeting deadlines but for the quality and cost-effectiveness of the final outcome. Your decision impacts how smoothly your project runs, how risks are managed, and ultimately, how satisfied you are with the result.

For busy NYC professionals looking to streamline an apartment renovation, the choice between these delivery methods means balancing innovation, execution, and communication. These factors are crucial in minimizing stress and ensuring your project is completed on time and on budget.

Infographic showing comparison between design-build and design-bid-build - design build vs design bid build infographic comparison-2-items-formal

Design build vs design bid build terminology:- design build- what is design bid build- design build institute of america

What is Design-Build?

Design-Build is a project delivery method where a single entity is responsible for both design and construction. This approach fosters collaboration, streamlines communication, and often results in a faster timeline. The design and construction phases overlap, allowing for more flexibility and efficiency.

Design-Build Advantages

  1. Quality of Work
    In the design-build process, quality is prioritized over cost. By choosing a contractor upfront, you can base your decision on qualifications and past performance rather than just price. This often leads to higher quality outcomes, as builders strive to exceed expectations rather than merely meet minimum requirements.

  2. Faster Timeline
    The design-build method eliminates the lengthy bidding process, allowing construction to begin sooner. A study by the Construction Industry Institute (CII) found that experienced design-build teams are more likely to succeed in maintaining schedules and speeding up construction.

Faster project completion - design build vs design bid build infographic 2_facts_emoji_grey

  1. Consistent Budget
    Early collaboration between designers and builders helps establish a reliable budget. Potential issues are identified and addressed in the initial phases, reducing the likelihood of unexpected cost increases later on.

  2. Reduced Risk for the Owner
    With design-build, the single entity is contractually obligated to meet the project's needs, minimizing conflicts between owners, architects, and contractors. This reduces the owner's risk and simplifies the process.

  3. Streamlined Communication
    When designers and builders work together from the start, communication is more effective. This collaboration leads to better decision-making and fewer misunderstandings.

Design-Build Disadvantages

  1. No Competitive Bids
    One downside is the absence of a competitive bidding process. This means you might not get the lowest possible price, as projects aren't awarded based on the lowest bid.

  2. Harder to Price Shop
    Bundling services makes it challenging to compare prices from different contractors. Many design-build firms won't start detailed designs until hired, limiting your ability to shop around.

  3. Lack of Contract Flexibility
    Committing to a single provider requires a high level of trust. You have less flexibility to make changes mid-project without starting over.

  4. Less Creativity
    The nature of design-build can sometimes stifle creativity. With overlapping phases, there's less time for innovative solutions, and design-builders may resort to one-size-fits-all approaches.

Less creativity in  projects - design build vs design bid build

Design-build is gaining popularity, accounting for 44% of construction spending and expected to grow by 18% in 2021. It's an attractive option for those seeking efficiency and reduced risk, but it may not suit every project's needs. Understanding its pros and cons can help you decide if it's the right choice for your next venture.

What is Design-Bid-Build?

Design-Bid-Build is the traditional project delivery method, widely used and trusted for its clear structure. This approach involves three distinct phases: design, bidding, and construction. Each phase is completed before the next one begins, ensuring a linear and straightforward process. The project owner first hires a designer to create detailed plans, then collects bids from contractors, and finally selects a builder to complete the construction.

Design-Bid-Build Advantages

  1. Competitive Bids
    One of the biggest advantages of design-bid-build is the competitive bidding process. Contractors submit bids based on the completed design, allowing the owner to choose the most cost-effective option. This often results in lower construction costs.

  2. Architect Involvement
    Architects play a crucial role in this method, ensuring the design meets the owner's vision. Since they are not tied to the construction team, architects can provide an unbiased, high-quality design.

  3. Distinct Roles
    In design-bid-build, responsibilities are clearly defined with separate contracts for designers and builders. This clarity helps establish accountability and reduces confusion over who is responsible for what.

  4. More Control for the Owner
    The owner has significant control over the project, from selecting the designer and contractor to making changes during the process. This flexibility allows for adjustments to be made without disrupting the entire project.

Design-Bid-Build Disadvantages

  1. More Change Orders
    Because contractors bid only on what is clearly outlined in the documents, any gaps or errors can lead to change orders. This can result in unexpected costs and delays.

  2. Late to Define Budget
    The project budget isn't firm until after the design phase is complete and bids are received. If bids exceed the budget, it may require redesigns or rebidding, causing potential setbacks.

  3. Extended Timeline
    The sequential nature of design-bid-build means that any delay in one phase can push back the entire timeline. This can be problematic for projects with tight deadlines.

  4. Lack of Product Logistics Insights
    Architects, being separate from the construction team, might not have insights into current market conditions or product availability. This can lead to designs that are difficult to execute due to material shortages or cost fluctuations.

  5. Conflict Between Teams
    With separate contracts, designers and builders might have conflicting interests, leading to communication issues and potential disputes. This can increase the risk of litigation and further delay the project.

Design-bid-build remains a popular choice for many, especially in public projects where competitive bidding is crucial. However, understanding its limitations is essential to determine if it's the best fit for your project needs.

Design-Build vs. Design-Bid-Build

Performance Comparison

When deciding between design-build vs design-bid-build, understand how these methods differ in terms of team structure, timeline, cost efficiency, project complexity, and owner involvement. Let's explore these aspects and see what studies have revealed about their performance.

Team Structure

In design-build, a single entity handles both design and construction, promoting collaboration and reducing potential conflicts. This unified approach often leads to smoother project execution, as the team works towards a common goal from the start.

Conversely, design-bid-build involves separate contracts for designers and builders. This separation can lead to clear role definitions but may also result in communication gaps and conflicts between teams.

Timeline Process

Design-build projects often have overlapping phases, which can significantly shorten the overall timeline. The University of Texas study found that design-build projects took less time to complete compared to design-bid-build. This is because tasks can occur simultaneously, reducing waiting periods between phases.

In contrast, design-bid-build follows a linear timeline, where each phase must be completed before the next begins. This sequential approach can lead to delays, especially if issues arise during any phase.

Cost Efficiency

The competitive bidding process in design-bid-build can drive down costs, as contractors vie to offer the best price. However, this method can also lead to more change orders and cost overruns if the initial design is incomplete or flawed.

Design-build, while sometimes perceived as more expensive due to its integrated approach, can actually result in less cost growth. The Construction Institute study highlighted a 3.8% reduction in cost growth for design-build projects compared to design-bid-build, thanks to better collaboration and fewer change orders.

Project Complexity

For complex projects, design-build offers an advantage by fostering close collaboration between designers and builders. This can lead to innovative solutions and more efficient construction processes.

Design-bid-build might be better suited for simpler projects where the owner needs strict control over design and construction phases. However, its rigid structure can be a disadvantage for more intricate projects requiring flexibility and adaptability.

Owner Involvement

Design-bid-build allows owners to have more control over the project, as they select and manage separate teams for design and construction. This can be beneficial for owners who want to be heavily involved in decision-making.

On the other hand, design-build reduces the owner's direct involvement, as the design-build team takes on more responsibility. This can be advantageous for owners looking to minimize risk and streamline project management.

Insights from Studies

Both the University of Texas and Construction Institute studies provide valuable insights into the performance of these methods. The University of Texas found that design-build projects were generally faster and less costly, while the Construction Institute reported fewer change orders and reduced cost growth with design-build.

These findings suggest that design-build may be better suited for projects where time and cost efficiency are priorities, while design-bid-build might be preferable for projects requiring competitive bids and owner control.

When to Choose Design-Build

Choosing the right project delivery method is crucial for the success of any construction project. Let's explore when opting for design-build is the smarter choice.

Complex Projects

For projects with intricate designs or technical requirements, design-build shines. The integrated team approach allows for seamless collaboration between architects, engineers, and contractors. This synergy often leads to innovative solutions and helps steer the complexities of the project more efficiently. The Construction Institute study highlighted that better collaboration in design-build projects results in fewer change orders, which is essential when dealing with complex structures.

Expedited Timeline

Need to fast-track your construction project? Design-build is your go-to method. Unlike the linear phases of design-bid-build, design-build allows for overlapping phases. This means construction can start even before the final design is completed. The University of Texas study found that design-build projects often finish faster because tasks can occur simultaneously, significantly reducing the overall timeline. This is especially beneficial for large-scale infrastructure projects where time is of the essence.

Cost and Quality Priority

When both cost and quality are non-negotiable, design-build offers a balanced solution. Although it may seem more expensive initially, the integrated approach can lead to cost savings in the long run. The Construction Institute study noted a 3.8% reduction in cost growth for design-build projects compared to their design-bid-build counterparts. This is largely due to the reduced number of change orders and the team's ability to adapt quickly to changes without incurring additional costs.

Reduced Owner Risk

For project owners who prefer to minimize their risk, design-build is an attractive option. With a single entity responsible for both design and construction, owners can pass on much of the project's risk to the design-build team. This setup not only streamlines communication but also ensures that any issues are resolved internally within the team, reducing the burden on the owner. Owners can enjoy peace of mind knowing that the team is aligned and accountable for delivering the project on time and within budget.

By understanding these scenarios, project owners can better decide when design-build is the right choice for their needs. This method is particularly advantageous for complex, time-sensitive projects where cost efficiency and reduced owner involvement are priorities.

Now, let's explore when design-bid-build might be the better option.

When to Choose Design-Bid-Build

While design-build offers many advantages, there are specific scenarios where design-bid-build is the better choice. This traditional method shines in certain types of projects and situations.

Simple Projects

For projects that are straightforward and lack complexity, design-bid-build is often ideal. Simple projects typically don't require the level of collaboration that design-build offers. Instead, the clear separation of roles allows each party to focus on their specific tasks. This separation can be advantageous when the project scope is well-defined and unlikely to change.

Competitive Bidding

One of the standout features of design-bid-build is the competitive bidding process. This method allows project owners to solicit bids from multiple contractors, potentially driving down costs. It provides a transparent way to compare pricing and ensures that owners can select a contractor who offers the best value. This is particularly beneficial for owners who are budget-conscious and want to explore multiple pricing options before making a decision.

Owner Control

In design-bid-build, the project owner retains significant control over the process. By managing separate contracts for design and construction, owners can choose their preferred teams and ensure that each phase aligns with their vision. This method is suitable for owners who want to be deeply involved in both the design and construction stages and who value having distinct oversight over each phase.

Public Projects

For public projects, design-bid-build is often a requirement. Government entities typically mandate a fair and open bidding process to ensure transparency and accountability in the use of public funds. This method aligns with public sector regulations and provides a clear framework for project execution. Additionally, the separation of design and construction can help address the unique needs and compliance requirements of public projects.

By recognizing these scenarios, project owners can make informed decisions about when design-bid-build is the right fit for their project. This method is particularly suitable for simple, budget-focused projects where owner control and compliance with public bidding processes are priorities.

Now that we've explored design-bid-build, let's address some frequently asked questions about these two project delivery methods.

Frequently Asked Questions about Design-Build vs. Design-Bid-Build

Why is Design-Build better than Design-Bid-Build?

Design-build is often considered superior for projects requiring quicker delivery. This method allows for simultaneous tasks because design and construction phases overlap. This can significantly reduce the overall project timeline. With a single contract encompassing both design and construction, the process is streamlined, minimizing delays often encountered in the traditional design-bid-build approach.

The collaboration inherent in the design-build method means fewer change orders and smoother communication. This results in a more efficient project flow, which is particularly beneficial for complex projects with tight deadlines.

What is meant by Design-Build?

In a design-build arrangement, a single entity is responsible for both the design and construction services. This means that a single contract covers both phases, creating a unified team that works together from start to finish. This approach fosters a collaborative process, where architects, engineers, and contractors work closely, ensuring that the project vision is consistently maintained.

The design-build model is known for its efficiency and ability to adapt quickly to changes, which is why it has gained popularity in recent years. By integrating design and construction, this method often leads to a more cohesive and streamlined project execution.

What is the difference between Design-Bid-Build and EPC?

Design-bid-build and EPC (Engineering, Procurement, and Construction) are both project delivery methods, but they differ in several key aspects. Design-bid-build involves separate contracts for design and construction, leading to a more segmented process. In contrast, EPC integrates engineering, procurement, and construction into a single contract, similar to design-build.

The EPC model is particularly useful for projects where time investment is critical, as it allows for a seamless transition between phases. While design-bid-build is often used for projects where owner involvement and control are priorities, EPC is preferred for projects that benefit from a collaborative process and require quick execution.

Each method has its place, and choosing between them depends on the specific needs and goals of the project at hand.

Conclusion

Choosing the right project delivery method can make or break your construction project. Whether you're considering the design-build or design-bid-build approach, weigh the pros and cons of each method based on your project's unique needs.

Design-build is ideal for projects that demand speed and efficiency. Its collaborative nature allows for overlapping phases, reducing the timeline and minimizing miscommunications. This method is perfect for complex projects where cost and quality are top priorities, and owners prefer reduced risk and involvement.

On the other hand, design-bid-build offers more control to the owner, with distinct roles and competitive bidding. It's best suited for simpler projects or public projects that require a fair bidding process. If you value having distinct phases and more control over separate contracts, this traditional approach might be the right fit.

At Intrabuild, we specialize in comprehensive design-build services that integrate design, construction, and client collaboration. Our approach ensures exceptional, innovative solutions custom to your needs, budget, and timeline. We are committed to exceeding client expectations through creative design and meticulous execution.

If you're interested in exploring how our design-build services can benefit your next project, visit our services page for more information.

For personalized consultation or to discuss your project requirements, contact us. Let's work together to transform your vision into reality.